Highway 20
• PG&E has been granted a Caltrans encroachment permit for utility repairs just west of Government Street on Tuesday. Intermittent full-road closures will be in effect from 8 a.m. to 3 p.m. Motorists should anticipate 5-minute delays.
• Pavement repairs from Rosemont Drive to the junction of Highways 20/53 will continue. One-way traffic control will be in effect from 6 p.m. to 5 a.m. or from 7 a.m. to 3 p.m. weekdays. Motorists should anticipate 15-minute delays.
• Rocky Fire repairs from Gravel Plant Road to the Lake/Colusa County line will continue. One-way traffic control will be in effect from 7 a.m. to 5 p.m., weekdays. Motorists should anticipate 5-minute delays.
Highway 29
• Valley Fire cleanup from the Lake/Napa County line to Hidden Valley will continue. One-way traffic control will be in effect from 7 a.m. to 7 p.m. seven days per week. Motorists should anticipate 15-minute delays.
• Pavement repairs from Main Street in Kelseyville to the junction of Highways 29/175 near Lakeport will continue. One-way traffic control will be in effect from 6 p.m. to 6 a.m. or from 7 a.m. to 7 p.m. weekdays. Motorists should anticipate 15-minute delays.
Highway 175
• Fire recovery work from the junction of Highways 29/175 in Middletown to Loch Lomond will continue. One-way traffic control will be in effect from 7 a.m. to 7 p.m. seven days per week. Motorists should anticipate 30-minute delays.