Skip to content
Author
UPDATED:

LAKE COUNTY >> The following is a schedule of roadwork planned until through Thursday, May 31. Please keep in mind work is weather permitting and subject to change.

For updates to this list, visit: www.dot.ca.gov/dist1/d1rib.htm , or check with the California Highway Information Network (CHIN) at www.dot.ca.gov or 1-800-GAS-ROAD (1-800-427-7623). For information pertaining to emergency roadwork, check the CHIN.

Route 20 (27.8/29.5)

Shoulder work near Foothill Drive will continue. Lane closures will be in effect from 7 a.m. to 6 p.m. weekdays. Motorists should anticipate minor traffic slowdowns. LC#C20DB

Route 20 (31.6)

Utility work will begin at Route 53 on Wednesday, May 30. One-way traffic control will be in effect from 7:00 a.m. to 4:00 p.m. weekdays. Motorists should anticipate 5-minute delays. LC#C20EB

Route 29 (20.31)

Full Closure from Route 53 to Morgan Valley Road for Lower Lake Parade and BBQ on Sunday, May 27. Full closure will be in effect from 10:00 a.m. to 1:00 p.m. Motorists should use an alternate route. LC#P29CA

Route 29 (22/22.2)

AT&T has been granted a Caltrans Encroachment Permit for utility work at Point Lakeview Drive beginning Wednesday, May 30. One-way traffic control will be in effect from 8 a.m. to 3 p.m. weekdays. Motorists should anticipate 5-minute delays. LC#P29CA

Originally Published:

RevContent Feed

Page was generated in 2.3113839626312